Drink in My Hand Toes in the Sand Short Sleeve V-Neck T-Shirt
$18.95 – $21.95
This contoured, classic cut V-neck T-shirt has that flattering style that’s sure to turn some heads. It’s great for layering under a sweater or sweatshirt and even better by itself with a pair of jeans. Definitely a go-to shirt; It’s a good idea to own this one in a few different designs!
Our Drink in My Hand Toes in the Sand Short Sleeve V-Neck T-Shirt is a 100% Hanes ComfortSoft® Cotton (or similar) relaxed fit t-shirt and will be a beach ‘go to’ all summer long.
• Made of 100% combed and ringspun cotton
• Pre-shrunk fabric
• Side seams
• Coverstitched v-neck and hemmed sleeves
• Shoulder-to-shoulder taping
Size | S, M, L, XL, 2XL |
---|---|
Color | Pink, White |
Size Chart
Size guideXS | S | M | L | XL | 2XL | |
Body Length (inches) | 26 ¾ | 27 ¾ | 28 ¾ | 29 ¾ | 30 ¾ | 31 ¾ |
Body Length Tolerance (tolerance) | 1 | 1 | 1 | 1 | 1 | 1 |
Body Width (inches) | 16 ½ | 18 | 20 | 22 | 24 | 26 |
Body Width Tolerance (tolerance) | 1 | 1 | 1 | 1 | 1 | 1 |
Our offers
Related products
Please note: Due to high demand current production time for Neck Gaiters is: 5-7 days. Thank you in advance for your patience!
Please note: Due to high demand current production time for Neck Gaiters is: 5-7 days. Thank you in advance for your patience!
Please note: Due to high demand current production time for Neck Gaiters is: 5-7 days. Thank you in advance for your patience!
Please note: Due to high demand current production time for Neck Gaiters is: 5-7 days. Thank you in advance for your patience!
Please note: Due to high demand current production time for Neck Gaiters is: 5-7 days. Thank you in advance for your patience!
Please note: Due to high demand current production time for Neck Gaiters is: 5-7 days. Thank you in advance for your patience!
Please note: Due to high demand current production time for Neck Gaiters is: 5-7 days. Thank you in advance for your patience!
Please note: Due to high demand current production time for Neck Gaiters is: 5-7 days. Thank you in advance for your patience!
Please note: Due to high demand current production time for Neck Gaiters is: 5-7 days. Thank you in advance for your patience!
Please note: Due to high demand current production time for Gaiter Scarves may be: 7-10 days. Thank you in advance for your patience!